Inero flood barrier is fast to install, simple to handle and requires no prior knowledge. One hour of installation results in 100 metres of barrier. The barrier comes with a cargo pallet where the barrier sections are kept standing upright and are picked consecutively, which allows for an ergonomicergonomically installation.
UNEVEN GROUND
Inero's barrier works on a variety of substrates. Use the quick connector to adjust the barrier height one or several levels.
UNLEVELLED GROUND
The barrier can be installed on slopes by using corner modules at the beginning and at the end of the slope.
KERB STONES
Inero's barrier can be used on kerb stones. Adjust the height one or several steps using the quick connector.
CORNER SECTIONS
Install the barrier around buildings or turn it by using 30 degree inner and outer corners.
OVERLAPPING BARRIER SECTIONS
The barrier sections always fit. If the distance does not fit, for example,example in connection to a wall, the barrier sections can be overlapped and joined together with a bolt on the top edge instead of using the quick connector. Overlapping can also be applied when two teams are working simultaneously and the barriers join in the middle.
ATTACH TO A BUILDING OR A BRIDGE FOUNDATION
Attach the barrier to a building or bridge by using a wall mount. It can be right aligned or left aligned.
ON FLOODED GROUND
Inero’s barrier can be installed in an already flooded area with water levels of up to 60 centimetres.
HEAVY PUMP TUBES
Thanks to its robust construction, the barrier can handle the weight of heavy pump tubes. It is even possible to let the pump tube run underneath the barrier section by adjusting the quick connector one step.